Surplus electrical wire & cable buyers · New York State

Direct buyer review · no fee to submit a lot

Call or text 614-715-3047

saleselectricalbuyers@gmail.com

New York Wire Buyers Surplus wire & cable desk
Cable reels in a yard below steel lattice structures against a wide sky

Collector systems · 15 kV and 35 kV

Renewable collector cable buyers in New York

A solar or wind project is a field of small generators tied together by medium-voltage cable. When the project is built out or repowered, a good deal of that cable is left over or comes back out.

  • New York State
  • Documented lots
  • Reels and cut lengths
  • Buyer review

Sell this cable

Send the construction, size and footage. Photographs can follow.

No fee and no obligation. Nothing is bought, moved or scheduled until written lot terms are agreed.

Prefer to talk? 614-715-3047 · saleselectricalbuyers@gmail.com

Quick answer

Collector cable is 35 kV class, usually 420 mil XLPE at the 133% level with an aluminum conductor, run direct-buried or in conduit between inverter stations, turbines and the collector substation. Surplus arrives in two patterns: over-ordered reels and cut-offs at construction close-out, and removed cable when a project is repowered or its feeders uprated, and the reserve the owner keeps for maintenance is often the best of it.

What a collector system does

A renewable project generates at a low voltage and delivers at a high one, and the collector is the step in between. In a solar plant, strings of modules feed inverters that produce at 480, 600 or 690 volts; each inverter block has a padmounted transformer stepping that up to the collector voltage. In a wind plant, each turbine generates at a low voltage and steps up at its own padmount. In a battery installation, the inverters and the DC blocks do the same job at a different duty cycle.

Those transformers then connect to a network of medium-voltage feeders that gather the plant's output and carry it to a collector substation, where it is stepped up again to the transmission or subtransmission voltage the grid connection requires. That gathering network is the collector system, and almost all of it is cable rather than overhead line, because the land is being used for something else and because a buried collector does not need a right of way of its own.

The result is a project that contains a surprising amount of medium-voltage cable in a small area. A large plant may have miles of collector feeder in a few square miles, most of it direct-buried, plus the conduit sections where it crosses a road, a drainage ditch or another utility.

Cable reels in a yard below steel lattice structures against a wide sky

34.5 kV, and why the collector is not a distribution feeder

The standard collector voltage in the United States is 34.5 kV, and the cable is 35 kV class: 420 mil XLPE insulation at the 133% level, single conductor, usually aluminum, with a copper tape shield or a concentric neutral. The reason for the voltage is reach. A collector feeder may run a mile or more between the furthest inverter and the substation, and at 34.5 kV the current for a given power is low enough that the cable can be a practical size and the voltage drop stays acceptable.

Older wind projects in particular were built with 15 kV collectors, using 220 mil cable and smaller conductors. That is one reason repowering is such a productive source of this material: a project that replaces its turbines and its inverters often upsizes the collector from 15 kV to 34.5 kV at the same time, and the old feeder cable comes out. Solar projects have also been built at 24.9 kV and 13.8 kV where the utility's practice or the project size pointed that way.

Sizing is driven by voltage drop and thermal limits together. Long feeders are limited by drop, short ones by ampacity, and both are affected by how the cables are buried: three single conductors in trefoil run cooler than three laid flat and spaced, and a duct bank runs hotter than direct burial in moist soil. That is why collector cable sizes vary so widely between projects of similar capacity.

Direct burial, conduit, and what survives

Most collector feeder is direct-buried: trench, sand or a flowable thermal backfill, cable, more backfill, warning tape and a tracer wire, with cover depth set by the project's design and the local code. The thermal properties of the backfill are part of the electrical design, not an afterthought, because they set the ampacity the cable can actually carry.

Conduit is used where the route crosses something it cannot disturb — a road, a railway, a wetland, an existing pipeline — and at transitions into equipment. Those crossings are often installed by horizontal directional drilling in HDPE duct, sometimes several hundred feet in a single bore, and the cable is pulled in afterwards.

That difference decides what can ever be recovered. Cable in conduit can, in principle, be pulled out and reused if the route is straight and the jacket is sound, though a long pull through a drilled bore rarely comes out undamaged. Direct-buried cable is cut out in short sections when a project is decommissioned, and it is usually recovery material rather than reusable cable. The valuable collector cable in the surplus stream is overwhelmingly the cable that never went in the ground.

Project typeCollector voltageTypical cableWhat close-out leaves
Utility-scale solar34.5 kV35 kV, 420 mil, aluminum, single conductorPart reels, home-run cut-offs, spare O&M lengths
Older wind15 kV15 kV, 220 mil, smaller conductorRemoved feeder at repowering, often direct-buried
Repowered wind34.5 kV35 kV, 420 mil to 1000 kcmilNew-build surplus, plus the old 15 kV feeder
Battery storage34.5 kV35 kV, 420 mil, short runs to the substationShort cut lengths and connector sets
Community solar15 kV or 34.5 kV15 kV, 220 mil, or 35 kV where the utility requiresSmall balances, often a few hundred feet

Close-out and repowering: the two surplus patterns

At construction close-out, the material is over-ordering. Collector cable is bought against a calculated footage with an allowance for pulls, transitions and damage, and what is left goes back to the contractor's yard or stays on site. Reels are usually partial rather than full, the cut-offs are the tails from home runs and transitions, and there is normally a reserve of cable the owner keeps for maintenance. That reserve is the piece sellers most often forget to mention and buyers most often want.

Removal only happens after the feeder is de-energised at the collector substation, isolated, proved dead and released under the site's own lockout procedure. At repowering, the material is removal. Turbines are replaced with larger machines, inverters are replaced with higher-rated units, and the collector is reconfigured, which produces both new-build surplus and the old cable. The old cable is the harder lot: direct-buried, cut out in short lengths, often with a jacket that has spent twenty years in wet soil, and frequently mixed with the old connectors and terminations.

New York's project pipeline feeds both patterns. Utility-scale solar has concentrated in the upstate counties where land is available and interconnection exists, wind in the North Country and the western counties, and battery storage closer to the downstate load. Siting runs through the state's renewable siting process and interconnection through the grid operator, and both take years — which means the cable for a project is often ordered long before the close-out lot exists.

  • Which project and which stage: new build, close-out, or repowering
  • Reel-by-reel footage rather than a total, since a part reel and a full reel price differently
  • Conductor size and material, and whether the shield is tape or concentric
  • For removed cable: whether it was direct-buried or in conduit, and how it was cut out
  • Whether the O&M spare is included, because it is usually the best cable on the site

Specification

What a buyer needs to know about this cable

Every row below changes what a lot is worth. If the reel tag is gone, the jacket print and a cut end usually answer most of it.

Missing detail is not a problem — say what is missing and the review works from photographs.

Specification checklist
Collector voltage34.5 kV on most utility-scale projects; 15 kV on older and smaller installations
Cable class35 kV or 15 kV shielded XLPE, 420 mil or 220 mil insulation at the 133% level
ConductorAluminum in most collector work, 1/0 to 1000 kcmil, single-conductor
ShieldCopper tape with drain wires, or a concentric neutral where the design calls for it
InstallationDirect burial in thermal backfill, or in HDPE conduit at crossings and transitions
TerminationsSeparable connectors at padmounted transformers and switchgear; stress cones at the substation
Project classesSolar, onshore wind and battery energy storage, plus the collector substation itself
Surplus formsOver-ordered reels at close-out, home-run cut-offs, spare O&M cable, removed cable at repowering

Constructions

Collector material we review

The same project can produce new surplus and twenty-year-old removed cable in the same week.

01

34.5 kV collector feeder

35 kV class, 420 mil, aluminum single conductor — the bulk of any collector lot and the easiest to price on footage.

02

15 kV legacy collector

220 mil cable from older wind and solar projects, removed when a collector is upsized or reconfigured.

03

Conduit and crossing sections

Cable pulled from HDPE bores at road and wetland crossings. Sometimes reusable, always worth inspecting before it is cut.

04

Close-out part reels

Partial reels from a construction contract, usually with the tag and the balance footage still readable.

05

O&M spares

The reserve the owner keeps for maintenance. Often full reels stored indoors, and the highest-value line on the site.

06

Substation end cable

Short runs and tails at the collector substation, with stress cones and separable connectors fitted.

New York

Collector cable in the New York market

New York's renewable build-out is spread across very different regions. The upstate counties hold the large solar and wind projects, where land is available and the collector runs across farmland; the downstate region holds storage and smaller installations where the constraint is interconnection capacity rather than space. Each produces a different collector lot, because the project size sets the cable size and the terrain sets the installation method.

The surplus usually appears at the end of a contract, when the EPC contractor demobilises. Cable that was bought for the job and not installed is the contractor's material to sell, and it moves at whatever the site demobilisation schedule allows. That is why these lots tend to be urgent and why the enquiry often comes with a date by which the cable has to be off site.

What helps a New York lot move

  • Reel tags and footage, photographed on site before anything is moved
  • Whether the cable is new surplus or removed, and how it was installed
  • Conductor size and material, with aluminum identified as such
  • Site access: weight limits on access tracks, and whether a lowboy can reach the laydown yard
  • The date the site has to be clear, since demobilisation sets the clock
Wooden reels of cable standing along a gravel drive in the open
Collector cable is bought by the reel against a calculated footage. What is left at close-out is usually partial, and usually still tagged.

Seller questions

Questions sellers ask

What voltage is collector cable?

Most utility-scale projects use 34.5 kV collectors, which means 35 kV class cable with 420 mil insulation at the 133% level. Older wind projects were often built at 15 kV with 220 mil cable, and some solar projects use 24.9 kV or 13.8 kV where the utility's practice requires it.

Is collector cable aluminum or copper?

Aluminum in most collector work, because the runs are long and the conductor sizes are large, and aluminum is lighter to pull and less expensive. Copper appears in some designs, at terminations and in shorter runs. The two are priced on different metal bases, so the material should be stated rather than assumed.

Can direct-buried collector cable be reused?

Rarely. Cable that has been buried for years is cut out in short sections when a project is decommissioned, and the jacket and shield usually show it. The reusable collector cable in the surplus stream is the cable that was never installed — part reels and cut-offs from construction rather than removal.

What is repowering, and why does it produce cable?

Repowering is replacing a project's major equipment — turbines, inverters, transformers — to increase output or extend life. The collector is often reconfigured or upsized at the same time, which means old feeder cable is removed and new cable is installed, so a single project can produce both a removal lot and a construction surplus lot.

Do you buy cable from community solar projects?

Yes. Community solar projects are smaller and their collector lots are correspondingly small, often a few hundred feet of 15 kV cable plus connector sets, but they are reviewed the same way. The reel tag, the footage and the voltage class are what a buyer needs.

Next step

Send the lot details

Include the storage city, how it is stored and what can reach it. If you have photographs of reel tags or jacket print, send them with the enquiry.

Send the lot details

Call or text the buying desk: 614-715-3047

saleselectricalbuyers@gmail.com

Send the lot

One desk reviews every lot that arrives.

No fee and no obligation. Nothing is bought, moved or scheduled until written lot terms are agreed.

Prefer to talk? 614-715-3047 · saleselectricalbuyers@gmail.com

Call 614-715-3047 Get a buy quote