Surplus electrical wire & cable buyers · New York State

Direct buyer review · no fee to submit a lot

Call or text 614-715-3047

saleselectricalbuyers@gmail.com

New York Wire Buyers Surplus wire & cable desk
Cable reels lined up along a narrow aisle between steel racks in a warehouse

Vertical building cable · 15 kV risers

Riser cable buyers in New York

Riser cable is the largest single cable most New York buildings own and the hardest to get out of the building. It hangs in a shaft, clamped at every floor, and it is measured in hundreds of feet per run.

  • New York State
  • Documented lots
  • Reels and cut lengths
  • Buyer review

Sell this cable

Send the construction, size and footage. Photographs can follow.

No fee and no obligation. Nothing is bought, moved or scheduled until written lot terms are agreed.

Prefer to talk? 614-715-3047 · saleselectricalbuyers@gmail.com

Quick answer

A riser is a vertical medium-voltage run from a street vault or service room to equipment higher in the building. Fifteen kilovolt class cable, copper, 220 mil, several hundred feet per run and several runs per building. Removal means cutting and lowering in sections, in an occupied building, around fire stops. Value is decided by footage, conductor size and how much of it can be recovered intact.

What a riser actually is

A riser is the vertical section of a building's electrical supply. Utility service arrives at 13.8 kV or 13.2 kV, enters the building at a street vault or a service room, and then has to get up to the point where it is transformed. In a tall apartment building that may be a transformer room a few floors up; in a commercial tower it may be several transformer rooms at different levels, each fed by its own riser. The cable that does that work is medium-voltage, shielded, and it is run in a shaft or a closet from the bottom of the building to the top.

The electrical requirement is simple: a 15 kV class cable with enough copper to carry the building's service current with acceptable voltage drop over a few hundred feet of vertical run. The physical requirement is not simple. The cable has to support its own weight over that height, be clamped so it does not slide, pass through a fire-rated floor slab at every level, and bend into a service room at the bottom and a switchgear lineup at the top without exceeding its minimum bend radius.

Buildings also hold secondary risers — the 208Y/120 V or 480Y/277 V feeders that run up the same shaft to panelboards. Those are a different product and a different value, and a building strip-out usually produces both. The medium-voltage riser is the smaller quantity and the higher value per foot.

Cable reels lined up along a narrow aisle between steel racks in a warehouse

Why riser cable is long, heavy and difficult to remove

Length comes from the building, not from the design. Thirty floors at roughly ten feet floor-to-floor is three hundred feet of cable in a single run, and a tower may have three or four such runs plus a spare. A 500 kcmil copper riser weighs in the region of three to four pounds per foot with its neutral and jacket, so a single run can be well over a thousand pounds hanging in a shaft.

None of it begins until the riser is de-energised at its source, locked out, proved dead at both ends — a riser can be back-fed from a generator or a second service — and formally released by the building and the utility. That weight is why removal is a rigging job rather than a pulling job. The cable is clamped at every floor, and the clamps are what hold it up; releasing them from the top without a plan drops a ton of copper down a shaft. Crews work from the top down or the bottom up, cut the cable at a floor, lower or raise the section under control, and carry it out. In an occupied building that means protecting stairs and lobbies, working outside business hours, and moving material through a freight elevator or a window with a hoist.

Pulling it out in one piece is rarely possible. A riser that has been in service for decades is bonded to its supports, may be in conduit with offsets and bends at every floor, and the jacket has taken a set. What comes out is a series of sections, each between forty and a hundred feet, and each with a cut end. Those lengths are long enough to be genuinely useful cable — which is the good news in an otherwise awkward job.

Supports, fire stops and the cost of putting it back

Every floor penetration in a riser is a fire stop. The cable passes through a sleeve or a framed opening, and the gap is sealed with a listed firestop system — intumescent sealant, firestop mortar, or pillows, tested to ASTM E814 and installed to a system drawing. Removing the cable destroys those seals at every floor, and they have to be reinstated to the building's fire separation before the floor can be closed up.

That is the reason a lot of riser cable is abandoned rather than removed. If a riser has failed or been superseded, the cheapest path for an owner is often to isolate it, cut it back at both ends, and leave it in the shaft, because reinstating fifty fire stops costs more than the copper is worth. A seller who is told the riser was abandoned in place has no material to sell, and it is worth confirming which it is before a site visit is arranged.

The older constructions complicate all of this. Risers installed before extruded insulation became standard are paper-insulated, lead-covered cable, which is heavier, needs wiped joints and lead sleeves at splices, and has to be supported at closer intervals because the lead sheath creeps under load. That construction has its own value basis and its own handling rules, and it is covered on the PILC page rather than here.

  • Whether the riser is being removed or abandoned, since one produces material and the other does not
  • The number of runs and the floor span of each, which gives the footage without measuring
  • Conductor size and material from the jacket legend or the original drawings
  • Where the cable can be cut and how sections leave the building — shaft door, stair, freight car
  • Whether the fire stops have already been disturbed, because that sets the reinstatement scope

What a building electrical upgrade releases

The common trigger is a service upgrade. A building that has grown its load — electrified heating, more cooling, electric cooking, electric vehicle charging in the garage — reaches the limit of its service and replaces the utility supply, the service switchgear, or both. The old riser is either re-used with new terminations at the top or replaced because the new gear sits somewhere else and the existing cable will not reach.

The second trigger is equipment failure or obsolescence. A riser that has been in service since the building was built is at the end of its design life, and a failure in a shaft is expensive to find and dangerous to fix. Buildings replace risers during electrical-room renovations, during conversions of commercial floors to residential, and during major lobby and core work when the shaft is accessible anyway.

What comes out is a set of streams: the riser cable itself in long cut lengths, any spare cable left coiled in the shaft or the electrical room from the original installation, the terminations at both ends, the supports and clamps, and, when the service gear goes too, the switchgear, CTs and bus. The building's electrical contractor normally holds it, and the material is in a basement or a loading dock rather than a yard, which is what makes the logistics of these lots different from an industrial one.

Specification

What a buyer needs to know about this cable

Every row below changes what a lot is worth. If the reel tag is gone, the jacket print and a cut end usually answer most of it.

Missing detail is not a problem — say what is missing and the review works from photographs.

Specification checklist
ConstructionShielded XLPE riser cable, 220 mil insulation at the 133% level, copper conductor
Size range1/0 AWG to 750 kcmil, with 500 kcmil common on tower service risers
Voltage15 kV class on 13.8 kV and 13.2 kV building services; older risers may be PILC
WeightIn the region of three to four pounds per foot at 500 kcmil with a concentric neutral
SupportClamped at each floor or on continuous strut, with the weight carried off the termination
PenetrationsFirestopped at every floor slab through a listed system
TerminationsStress cones or separable connectors at both ends; potheads on older paper/lead risers
AccessShaft, stair, or electrical closet; no crane access, material carried or hoisted by hand

Constructions

Riser material we review

A tower upgrade produces long sections of one cable type and a great deal of hardware around it.

01

15 kV service risers

The main vertical run from the vault to the transformer room. Long sections, large copper, and the best material in the building.

02

Sub-feeder risers

Smaller runs feeding individual transformer rooms or upper-floor gear. Shorter sections, often with more bends and more cut-offs.

03

Spare risers and stored reels

Cable bought for the original job and left in the electrical room. Usually the cleanest material and the easiest to overlook.

04

Terminations and potheads

Stress cones, separable connectors and, in older buildings, oil-filled potheads with brass and copper content.

05

Abandoned risers

Cable isolated and left in the shaft. No material unless it is actually removed, which is worth confirming before anything is quoted.

06

Secondary riser cable

600 V feeders up the same shaft, priced separately as building wire rather than as medium-voltage cable.

New York

Riser work in the New York market

New York City's residential stock is dominated by tall buildings, and a great many of them are served at medium voltage with a vertical riser rather than a single low-voltage service. Co-ops, condominiums, rental towers and commercial buildings all hold this cable, and the buildings that hold the oldest installations are frequently the ones now doing the largest electrical work.

Service upgrades are the engine. Electrification of heating and hot water, additional cooling, and garage charging all raise the building's demand, and the utility service and the riser behind it have to be sized for the new load. A building that upgrades its service usually replaces the gear at the same time, and the cable comes out as part of that package.

The logistics are the local speciality. Work is scheduled around residents, material moves through service corridors and freight cars, and the electrical contractor often has a narrow window in which the shaft is accessible before the fire stops are closed and the finishes go back. That window is why the enquiry is usually urgent and why a buyer who can respond to a loading dock rather than a yard is the useful one.

What helps a New York lot move

  • Building address and the floor span of the riser, which gives footage quickly
  • Whether the cable is being removed or abandoned in place
  • Conductor size, insulation thickness and whether the construction is XLPE or paper/lead
  • How sections can leave the building, and whether a freight elevator or loading dock is available
  • When the shaft is accessible, since fire stop reinstatement usually sets the deadline
Cable reels standing on bare dirt in front of a substation fence and steel structures
A riser leaves a tower as cut sections, not as reels. It is the longest reusable cable most buildings ever release.

Seller questions

Questions sellers ask

How long is a building riser?

It is the height of the building from the service point to the equipment it feeds. At roughly ten feet floor-to-floor in residential construction, a thirty-storey run is about three hundred feet, and a tower may have several runs plus a spare. Commercial floors are taller, so the same number of storeys gives more cable.

Can riser cable be pulled out in one piece?

Rarely. The cable is clamped at every floor and has been in place for decades, often in conduit with offsets at each slab. Removal is done by cutting at a floor and lowering or raising the section under control, which produces sections of forty to a hundred feet rather than one continuous length.

What happens to the fire stops when a riser is removed?

They are destroyed. Every floor penetration is sealed with a listed firestop system, and pulling the cable out of the opening removes that seal. The building has to reinstate each one to maintain the floor's fire separation, which is a real cost and the main reason some owners abandon a riser in place instead of removing it.

Is an abandoned riser worth anything?

Only if it is removed. Cable left isolated in a shaft has no buyer, because nobody is going to open fifty fire stops for it unless the building is already doing that work. If the riser was abandoned rather than taken out, say so, and the enquiry becomes a question about the other material on the job.

Are older risers different?

Yes. Risers installed before extruded insulation was standard are paper-insulated and lead-covered, which makes them heavier, more difficult to support and different to handle, because the sheath is lead. Those lots are reviewed on the paper and lead construction rather than as XLPE, and the construction should be identified from the drawings before the visit.

Next step

Send the lot details

Include the storage city, how it is stored and what can reach it. If you have photographs of reel tags or jacket print, send them with the enquiry.

Send the lot details

Call or text the buying desk: 614-715-3047

saleselectricalbuyers@gmail.com

Send the lot

One desk reviews every lot that arrives.

No fee and no obligation. Nothing is bought, moved or scheduled until written lot terms are agreed.

Prefer to talk? 614-715-3047 · saleselectricalbuyers@gmail.com

Call 614-715-3047 Get a buy quote